Project Overview
- Type: Coastal / Marine Engineering
- Client: PortMiami – Miami-Dade County
- Location: Miami, FL
PortMiami is one of South Florida’s most critical economic engines, contributing $41.4 billion annually and supporting over 324,000 jobs. To maintain the operational and structural integrity of the port’s infrastructure, G.M. Selby was engaged to perform a comprehensive inspection of the bulkhead walls and associated hardware, assessing damage, corrosion, and structural stability.
Project Background
Years of marine exposure and heavy port operations had caused deterioration to PortMiami’s bulkhead walls. The port required a detailed assessment to identify structural deficiencies, prioritize repairs, and ensure continued safe operations. This project was crucial to protect the port’s assets, maintain vessel operations, and sustain its significant economic impact.
Key Structural & Environmental Challenges
Advanced Corrosion & Marine Deterioration
Structural Cracking & Reinforcement Exposure
Debris Accumulation & Limited Accessibility
Active Port Operations & Safety Constraints
Scope of Work
The engineering services provided included:
- Underwater inspections of bulkhead walls, sheet piles, and foundations
- Topside inspections of structural components and associated hardware
- Documentation and assessment of observed deficiencies
- Preparation of comprehensive reports with repair recommendations
- Support for PortMiami’s rehabilitation and maintenance planning
Project Significance
The PortMiami Bulkhead Wall Inspection project was essential for preserving the structural and operational integrity of one of South Florida’s key economic assets. Through thorough engineering assessments, G.M. Selby provided actionable insight, enabling the port to maintain safety, mitigate risks, and plan for sustainable infrastructure maintenance. This work ensures that PortMiami continues to support regional commerce and employment while protecting vital marine and structural resources.