25-Year Water Intrusion Resolution – Miami-Dade County Courthouse
Project Overview
- Disciplines: Forensic Engineering, Structural Monitoring, NDT, Remediation Design
- Location: Miami, FL
- Timeline: 1-Year Intensive Investigation
For over two decades, a prominent Miami-Dade County Courthouse suffered from persistent water intrusion that compromised structural integrity and operational efficiency. Despite numerous attempts by prior engineering firms to identify the source, the issue remained unresolved.
G.M. Selby was commissioned to perform a definitive, year-long forensic investigation. Our team succeeded where others failed, utilizing a combination of persistent field observation and high-technology diagnostics to isolate the root cause and design a permanent engineered solution.
From Investigation to Implementation
Designing the future of a dry, resilient courthouse.
Prioritized Deficiency Report
Deploying surgical interventions to stop active leaks during the design phase.
Permanent Engineering
Designing specialized waterproofing and structural reinforcement systems tailored specifically to the courthouse's unique geological and architectural profile.
Long-Term Monitoring
Ensuring that the engineered solutions perform as intended through ongoing structural health check-ups.