16-Story High-Rise Structural Demolition

Project Overview

Demolishing a high-rise in Downtown Miami presents a unique set of engineering challenges, from zero-lot-line constraints to rigorous environmental protections. G.M. Selby was retained to provide end-to-end engineering and design services for the 16-story deconstruction. Our role spanned from the initial design of the demolition sequence to active construction management and onsite monitoring, ensuring the project remained compliant with stringent municipal safety standards.
Comprehensive Technical Oversight

A multi-disciplinary approach to high-stakes construction management.

Structural & Electrical Inspections

Detailed pre-demolition audits to identify load-bearing risks and safely decommission complex electrical grids.

Design & Documentation

Preparation of detailed design drawings that outlined the step-by-step removal of structural elements.

Environmental & Impact Monitoring

Continuous monitoring of vibration levels and dust suppression to mitigate the impact on the Downtown Miami business district.

Financial & Administrative Oversight

Reviewing and approving/disapproving contractor payment draws to ensure project financial integrity.